Night report 2025-04-05
Night report 2025/04/05
Observers: Chris Duffy, Melzie Ghendrih (Lancaster University)
Support: Georgios Dimitriadis, Lydia Makrygianni, Andrew Milligan, Mathew Smith (Lancaster University)
TAT: Lluís Galbany (ICE-CSIC), Amit Kumar (University of Warwick), Priscila J. Pessi (Stockholm University)
Start: 23:28 UT | Humidity: 19.6 % | Wind speed: 10.3 m/s | Seeing: 1.50
Midway : 05:45 UT | Humidity: 14.5 % | Wind speed: 12.2 m/s | Seeing: 1.70
End: 09:40 UT | Humidity: 16.1 % | Wind speed: 12.7 m/s | Seeing: 1.8
Afternoon Calibrations:
Darks, arcs and dome flats done in the afternoon
Sky flats done during twilight. All completed, although only 4 exposures in i-band
Notes
23:30UT: Based on first standard, swtiched to slit 1.5
04:13UT: rebooted instrument as link between instrument and telescope was lost
04:34UT: Instrument problems being diagnosed. Problem with lamp identified. Identified as issue with lamp shutters.
04:54UT: Resumed operations. Intermitent problem with lamp shutter indentified. Several flats taken, some failed some worked.